·PPEN
CNDA and ASIPP signed post engineering design and domestic integration contract

On 14th June, 2013, CNDAand ASIPP signed post engineering design and domestic integration for all ofthe PPEN components:This contractincludes the necessary work for the Final design of PPEN,it includes thedetailed analysis of the design dataand diagrams, transferring to domestic design data andfiles for domesticmanufacturers; The supplier shall ensure all the components can beintegrated inthe final function, The supplier shall also provide all the technical supportandassistance to CNDA during the manufacturing, FAT, installation, SAT andcommissioningPhases.