·AC/DC Converter
Updated the original 2001 design

Modify the original FDR 2001 design, pointing out the design risks anddefects, modify the unreasonable and unavailable part of original design andput forward the new scheme which is ensure the reliable operation of the ITERpower supply system. Theimproved scheme had been approved successively by two independent expert groupsand became the final baselines of the ITER power supply scheme. At the same time itadds 45 KIUA for Chinese converter procurement package