·Correction Coil
Manufacturing Drawing Review

According to CCPA, the manufacturing drawing of CC should be designed by the supplier of CCduring PA phase II. Hundreds of the manufacturing drawings were designed byASIPP. And the CC manufacturing drawings have been reviewed by CNDA and ITER organization.

DAreview of CC manufacturing drawings